Client: Lowry Building and Civil Engineering Ltd.
Date: Sept ’16 – July ’17
Location: Tannaghmore, Ballymena
Project Details:
Works on site included the following:
- Demolition and removal of existing buildings
 - Installation of Macwall
 - Installation of Green Terramesh Retaining wall
 - Installation of Site Drainage
 - Installation of Building Foundations
 - Installation of Concrete Precast Piles
 - Installation of Fuel Storage Tanks
 - Installation of Rainwater tank
 - Installation of Forecourt Separator
 - Reduce and rebuild Slip road leading to site
 - Installation of kerbing, fencing and surfacing
 