Client: Powercomm
Date: July 2021 – November 2021
Location: Killala Wind Farm, Killala, Co. Mayo

Project Details:

TheĀ  project consisted of the construction of new Battery Storage facility located within Killala Wind Farm, Killala, Co. Mayo.

The contract included the following:

  • Levelling of existing site
  • Removal of vegetation
  • Installation of ducting
  • Installation of concrete plinths
  • Installation of site drainage
  • Construction of house and auxiliary transformer bases
  • Construction of Grid Transformer bases
  • Cable trench and slip trenches
  • Installation of palisade fencing
  • Installation of finished stone surface around the bases