Client: Orsted
Date: November 2021 – May 2023
Location: Johnstown, Co. Kilkenny

Project Details:
The project for Orsted involved the Construction of an 8 turbine wind farm located between Johnstown, Co. Kilkenny and Templetuohy, Co. Tipperary. Works included the following:

  • Installation of Site Tracks to facilitate construction
  • Installation of 8 turbine foundations including 2 piled foundations
  • Installation of cofferdam to facilitate installation of piled foundation
  • Installation of turbine hardstands, blade laydown areas and crane assist pads
  • Installation of drainage to facilitate the site tracks
  • Installation of Box culverts
  • Installation of culverts at water crossings
  • Installation of cable route from Lisheen I & II to Lisheen III

Similar Projects

Belcoo 33/11kV Substation

Poulaphouca Remediation

Clady Public Realm

Smulgedon Control Building

Corby Knowe Met Mast

Broadway Flats Substation

Ardstraw Substation

Evishagaran Turbine Delivery Route

Gorman Transformer Bases

Kells Substation