Client: Smith Bros Ltd.
Date: June ’17 – Sept ’17
Location: Maghaberry, Co. Antrim
Project Details:
The works package consisted of Civil Engineering infrastructure works required for a Photovoltaic Solar farm. Construction of the substation building formed the main element of the contract.
Works included:
- 200m of site access tracks
- Construction of 33Kv substation building.
- Electrical installation
- Drainage and installation of ducting to facilitate installation