Project Description
Client: Limavady Borough Council
Contract Period: 3 Months
Location: Burnfoot River, Ballymacran. The area is part of the Lough Foyle Wildfowl Reserve & RAMSAR (Wetlands of International Importance) designated.
Project Details:
- Fabrication & installation of 30m long x 2m wide single span steel truss footbridge.
- Construction of 150m access track & crane hardstanding.
- 8 no. piles to 12m depth.
- Formwork & construction of steel reinforced concrete abutments & steps leading to bridge
Similar Projects