Client: CGN
Date: August 2023
Location: Corby Knowe Wind Farm

Project Details:

  • Construction of new concrete foundation for the Met Mast
  • Installation of 1KM of ducting to facilitate communication link to control building
  • Installation of RC Duct pits along cable route
  • NIE palisade fence around the Met Mast compound
  • GRP kiosk on plinth
  • Permanent generator and fuel tank on plinth
  • All SUDS drainage associated with the works to tie in with the existing drainage on site.