Client: Lowry Building and Civil Engineering Ltd.
Date: Sept ’16 – July ’17
Location: Tannaghmore, Ballymena

Project Details:

Works on site included the following:

  • Demolition and removal of existing buildings
  • Installation of Macwall
  • Installation of Green Terramesh Retaining wall
  • Installation of Site Drainage
  • Installation of Building Foundations
  • Installation of Concrete Precast Piles
  • Installation of Fuel Storage Tanks
  • Installation of Rainwater tank
  • Installation of Forecourt Separator
  • Reduce and rebuild Slip road leading to site
  • Installation of kerbing, fencing and surfacing