Client: Orsted
Date: January 2022 – June 2023
Location: Larne, Co. Antrim

Project Details: The project consisted of the construction of 7 turbine wind farm on elevated site overlooking Larne.  Works included the following:

  • Construction of Site Tracks
  • Excavation of turbine bases
  • Installation of turbine foundations
  • Installation of Cable route
  • Construction of Control Building
  • Installation of Culverts
  • Installation of SuDS drainage
  • Installation of Passing bays on access road
  • Installation of concrete apron at Site entrance